Preserve the tested assembly
Product identity, substrate, primer compatibility, required thickness and the listed assembly must be confirmed from current project documents. A trade name alone is not enough to select or repair a fireproofing system.
Application planning
Steel readiness, masking, access, ventilation, sequencing and quality-control responsibilities belong in the scope before spraying begins.
Existing HiBar installations
Older work should be assessed for impact damage, moisture exposure, bond loss, missing material and undocumented alterations before a repair method is chosen.
Start with the existing conditions
Send the substrate, exposure, access constraints and desired outcome to build@buildershaus.com.