Planning spray-applied fireproofing work

The project information needed to coordinate a specification-led passive fire-protection scope.

01

Confirm the assembly

The design listing, material, required thickness, substrate and primer compatibility must be established from the project requirements.

02

Coordinate readiness

Steel should be accessible and in the required condition. Other trades, enclosures, services and finished surfaces affect masking, sequencing and access.

03

Control the work zone

Spray application requires a managed area with suitable ventilation, protection and restricted access. Project-specific safety planning belongs with qualified professionals.

04

Plan quality review

Thickness, adhesion or density checks may be required by the specification or authority. Define responsibilities and documentation before application begins.